New concrete skatepark in Parco Fausto Noce, Olbia, with a triangular bank in front, quarter pipes, rails and floodlight poles beside a sports hallPhoto: Sardinia Blog

Olbia's new skatepark in Parco Fausto Noce is free and open

A free concrete skatepark opened in Olbia's Parco Fausto Noce on 14 November 2026, in the same park where the city's first one stood until a flood and a fire. This guide covers what is in it, the park's free and paid courts, and the Caocci athletics stadium, which is not open to the public yet.

By Danny de BuissyIndependent local volunteer

Published 14 November 2026 · Updated 14 November 2026

Contents

Olbia has a skatepark again, in the same park where the city's first one stood. The new concrete skatepark in Parco Fausto Noce opened on Saturday 14 November 2026, and it is free for everyone. By midday on opening day the comune had not announced it anywhere we could find, so what follows comes from our own visit that day and from the plans the comune has published since 2024.

  • Where: Parco Fausto Noce, Olbia's big city park, in the sports area next to the children's playground.
  • Opened: Saturday 14 November 2026.
  • Price: free, like the park itself.
  • Style: a concrete street plaza with banks, a quarter pipe, ledges and rails. There is no bowl.
  • Paid for by: Italy's PNRR recovery funds, as part of the comune's plan for a sports citadel in the park (Comune di Olbia).

Olbia's third skatepark in fifteen years

Skaters in Olbia have been here before. The city's first skatepark opened in this same park on 19 May 2011, with the Olbia-born rapper Salmo performing at the opening. A flood damaged it in 2013, and in 2016 a fire destroyed what was left of the equipment. By January 2018 only an open concrete space remained, and a petition for a new park had passed 1,000 signatures (Olbia.it).

In June 2019 the comune opened a second one: five steel structures on Via Nanni, by the railway station car park (L'Unione Sarda). Within a year vandals had pried off its granite edging and covered the steps in marker pen, Gallura Oggi reported in February 2020.

The third one is poured concrete, set into the ground. Mayor Settimo Nizzi announced it in July 2024 along with new basketball, volleyball, five-a-side, tennis and padel courts in the park, all paid for with PNRR money and free to use (Gallura Oggi). Two years and four months later, it is open.

What is in the skatepark

It is a street-style plaza rather than a bowl park, laid out on a long slab between a sports hall and the lawn. What we saw on opening day:

  • A big triangular bank on the front edge, the first thing you see from the lawn.
  • A tall bank at the sports-hall end and, at the playground end, a quarter pipe with a wavy steel coping along its lip.
  • A low hump in the middle.
  • Manual pads with steel edges, flat bars, a curved rainbow rail and low ledges.

Floodlight poles stand around the edge, but we could not confirm when they are switched on. Beginners have room on the flat ground and the low ledges. If you want a bowl or a vert ramp, this is not the place.

The rest of the sports park

The skatepark is the newest part of a park that already works as Olbia's outdoor gym. When we visited on 14 November 2026:

  • Basketball and volleyball: two basketball courts and a volleyball court, free to use. The basketball courts are floodlit from an hour before sunset until 22:00. More on them, and on the island's clubs, in our article on basketball in Olbia and Sardinia.
  • Five-a-side football: a fenced pitch on artificial grass, open to anyone without a booking for now (November 2026).
  • Tennis and padel: the courts we saw are paid. The comune's PNRR plan lists a tennis court and a padel court among the free facilities, but as of 14 November 2026 there is no free tennis or padel in the park.
  • Playground: a fenced children's playground right next to the skatepark, so one parent can keep an eye on both.
  • PalaDeiana: the indoor sports hall, reopened in 2025 after a long renovation (La Nuova Sardegna).

For the quieter side of the park, the pond, the paths and the shade, see our guide to Parco Fausto Noce and the free book cabinet by the pond. For the rest of the town, see our Olbia guide.

The athletics stadium: not open yet

The Campo Angelo Caocci, the football and athletics ground inside the park, is not open to the public yet, though from the path it already looks good. Since 2025 it has had new synthetic turf over the old clay pitch and a short covered training track under a long wooden canopy, with roofed stands and new lighting also in the plan. When the canopy went up, the mayor said the covered track would let the city's athletes and sprinters train there, "and above all Filippo Tortu", the Olympic relay champion, who used to train at Fausto Noce (La Nuova Sardegna).

In May 2026 the amateur football league, the Lega Nazionale Dilettanti, approved the pitch and the covered track. The main athletics track is not finished: the council has set aside €1.2 million to rebuild it from scratch, and the mayor said the contractor would be in place in November 2026 (Gallura Oggi, 28 May 2026). Until it opens, you see it from the path.

Getting there and when to go

  • Getting there: the park is about a 10 to 15 minute walk from Corso Umberto I, with the main entrances along Viale Aldo Moro. ASPO city buses stop nearby; see our guide to Olbia's buses and trains. Free street parking around the park fills up in the late afternoon and at weekends.
  • Hours: officially sunrise to sunset, but in practice the gates open at 7:00 and close at 22:00 (as of November 2026).
  • Wind: the mayor can close the whole park when strong gusts are forecast, as he did on 11 and 12 February 2026 (Teleregione Live). On a mistral day, check before you carry a board across town.

Sources: Comune di Olbia, PNRR works · Gallura Oggi, 9 July 2024 · Olbia.it, 8 January 2018 · L'Unione Sarda, 20 June 2019 · Gallura Oggi, 19 February 2020 · La Nuova Sardegna, 4 February 2025 · La Nuova Sardegna, 23 June 2025 · Gallura Oggi, 28 May 2026 · Teleregione Live, 11 February 2026. Links checked 14 November 2026. The skatepark's features, the courts, the park's hours and the state of the stadium were checked by Sardinia Blog on 14 November 2026.

Photos: Sardinia Blog, 14 November 2026.

Rental12, a holiday-rental company in Olbia that shares an owner with Sardinia Blog, lets its own homes in Olbia and Golfo Aranci.

olbiafree-entryfamily-friendlygallura

Frequently asked questions

Is the new skatepark in Olbia free?

Yes. The skatepark in Parco Fausto Noce is free for everyone, like the park itself. It was paid for with Italy's PNRR recovery funds, and the comune's plan says the new outdoor sports facilities in the park are free to use. The park is officially open from sunrise to sunset, but in practice from 7:00 to 22:00. Bring your own board and helmet.

Where exactly is the skatepark in Parco Fausto Noce?

It is in the sports area of Parco Fausto Noce, between an indoor sports hall and the lawn, right next to the fenced children's playground. The park is in central Olbia, about a 10 to 15 minute walk from Corso Umberto I, and the main entrances are along Viale Aldo Moro. ASPO city buses stop nearby.

When did the Parco Fausto Noce skatepark open?

It opened on Saturday 14 November 2026. By midday on opening day the comune had not published an announcement we could find. It is Olbia's third skatepark: the first opened in the same park in 2011 and was lost to a flood and a fire, and a steel one on Via Nanni opened in 2019 and was vandalized within a year.

Is the Olbia skatepark good for beginners?

Yes, for street skating. It is a concrete plaza with flat ground, low ledges, a low hump, manual pads and banks, so there is room to learn. There is no bowl and no vert ramp, so skaters looking for deep transitions will find little here. The quarter pipe at the playground end is the main transition.

What other sports facilities are in Parco Fausto Noce?

On 14 November 2026 we found two free basketball courts, a free volleyball court, a five-a-side football pitch open without a booking for now, paid tennis and padel courts, a fenced playground and the PalaDeiana indoor sports hall. There is no free tennis or padel, although the comune's plan lists both. The Caocci athletics stadium is inside the park but not open yet.

Is the Caocci athletics track open to the public?

No, not as of 14 November 2026. The pitch and the short covered track were approved by the Lega Nazionale Dilettanti in May 2026, but the main track still has to be rebuilt, with €1.2 million set aside by the council. The mayor said the contractor would be in place in November 2026. We found no announced opening date.

Explore nearby

More from this corner of Sardinia